Skip to content

SERVICES

Keep what works Engineer what comes next

A new recipe, a capacity constraint or a move to another building can change what your plant needs to do. Wolmec assesses existing installations and develops the mechanical and control changes around the next production requirement.

Discuss this application
Complete dry-premix plant with mixing tower and silos
In the field: Dry-premix plant relocation and revamping

Choose the right intervention

Upgrade, expand or relocate

Remove a process constraint

Review the material route, dosing sequence, mixer supply and operating conditions to identify where an intervention is useful.

Add storage or a new material

Integrate additional silos, tanks, receiving points or ingredient routes with the equipment already in service.

Move and reconfigure

Survey the existing machines and develop a layout that combines retained assets and new systems at the destination site.

Working method

Survey first Define the interfaces Plan the change

01

Understand the current plant

Review the materials, equipment condition, available drawings, production sequence and the specific problem to solve.

02

Develop the intervention

Define what is retained, modified or replaced. Coordinate the new layout with structures, utilities and control interfaces.

03

Install and verify

Plan the installation sequence and agreed production stops. Complete dry and functional testing, then train the operators on the changed system.

A decision with context

Compare the whole intervention

The cost of a retrofit is more than the price of a replacement machine. Access, installation, interfaces, downtime, operating demands and future changes all belong in the decision. Wolmec's technical proposal defines the scope and assumptions so the options can be evaluated.

In the field

See how it works in a real plant

All projects

Revamping · Construction materials

Dry-premix plant relocation and revamping

An existing dry-mix plant adapted to a new factory. Equipment surveys and 3D layout planning connect retained machinery with aggregate grading, ingredient dosing, batch mixing and recipe management linked to the customer's laboratory.

Revamping · Minerals

Calcium carbonate storage, dosing and transfer

A calcium carbonate handling system developed around rising raw-material demand, limited space and the structures of an existing production plant. Storage, dosing, transfer and Wolmec control software connect the expansion to the operating process.

Practical questions

Before we start

Clear answers to help define the next step.

Do we need complete drawings before contacting you?

No. Begin with the available layout, equipment list and photographs, plus a description of the issue. The first assessment identifies what still needs to be surveyed.

Can you work with equipment supplied by other manufacturers?

Existing equipment can be assessed for integration or modification. Condition, documentation, interfaces and the proposed duty determine whether it is suitable to retain.

Can work happen without stopping production?

The installation sequence depends on the site and the interfaces involved. Required production stops must be assessed and planned; continuous operation should not be assumed.

Is relocation an opportunity to change the process?

Yes. Wolmec's dry-premix reference used relocation to revise the layout, add equipment and integrate the production controls. The reusable assets and the new building were assessed together.

Start with your process

A useful first conversation starts here

Tell us what needs to change. A complete engineering specification can come later.

Build your project brief

Useful information to share

  • What limits production today
  • Equipment and controls to retain
  • New product or output requirements
  • Available space and installation windows
Prefer a direct email?