Skip to content

Wolmec Plant Care

Know your plant
Plan its care

Maintenance for powder and liquid processing plants

Turn equipment condition into planned action

Wolmec Plant Care connects preventive and corrective maintenance with technical assessment and follow-up. The aim is to address deterioration and recurring problems, organise interventions and support the operation of the installation over time.

Available for Wolmec-built plants and, after an initial technical assessment, installations from other manufacturers.

Preventive maintenanceCorrective interventionsAssessment & reporting

Four connected service areas

Understand the condition
Define the next action

A useful maintenance programme connects observations, interventions and production needs. Each activity contributes to a clearer picture of the plant.

01

Preventive maintenance visits

Plan inspections around the equipment and production schedule. Review condition, wear and progressive deterioration to define the maintenance actions needed.

Equipment condition · Wear · Planned maintenance

02

Corrective maintenance & repairs

Assess a fault or operating problem and define the mechanical, electrical or automation intervention within the agreed scope.

Fault assessment · Repair scope · Functional checks

03

Plant performance assessment

Look at storage, transfer, dosing, weighing, mixing and automation together. A limitation at one stage can influence the complete process.

Process interfaces · Operating issues · Improvement priorities

04

Technical reports & improvement plans

Record the findings and the work carried out. Identify the next maintenance actions and any changes that need a separate engineering assessment.

Intervention report · Recommended actions · Follow-up

Service agreements

A plan shaped
around the installation

The plan duration is one part of the agreement. Equipment coverage, visit frequency, intervention scope and response conditions are defined for the plant and its operating schedule.

Plan duration

Six months

A six-month service agreement with the inspection and maintenance programme defined for the installation.

Plan duration

Annual

An annual service agreement with scheduled activities and follow-up agreed around the plant's operating needs.

Defined together

  • Equipment and systems covered
  • Visit schedule and inspection scope
  • Corrective-intervention conditions
  • Reporting and recommended actions
  • Parts and additional work, where required
Discuss your service plan

The plant as a connected process

Look beyond
the individual component

A problem may appear at a feeder or mixer while its cause lies elsewhere. The assessment considers the equipment and its relationship with the material route and control sequence.

Storage & discharge
Ingredient storage, extraction arrangements and the condition of the discharge interface.
Conveying & transfer
Powder or liquid routes, transfer equipment and the connections between production stages.
Dosing & weighing
Feeding, measurement and sequence requirements, considered with the actual material and operating conditions.
Mixing & automation
Equipment operation, plant controls and the way process stages interact.

Wolmec and third-party installations

The first step
is understanding the plant

For a plant supplied by another manufacturer, an initial technical assessment defines whether and how Wolmec can support the installation. Available drawings, equipment information, controls documentation and service history help establish the starting point.

The resulting service scope identifies the systems covered and the activities to plan. Where equipment or automation changes are needed, the findings can lead to a dedicated revamping proposal.

Explore revamping & expansions

From assessment to follow-up

A practical route
to ongoing support

Start with the issue you know. We can identify the remaining information needed to assess the installation.

  1. 01

    Share the context

    Plant, equipment, current issues and the site's operating schedule.

  2. 02

    Assess the installation

    Review condition, documentation and the priorities for maintenance or investigation.

  3. 03

    Agree the programme

    Define coverage, planned visits, intervention conditions and responsibilities.

  4. 04

    Act & follow up

    Carry out the agreed activities and use the reports to plan the next actions.

Practical questions

Before we start

Clear answers to help define the next step.

What is included in Wolmec Plant Care?

Plant Care brings together planned preventive maintenance, corrective maintenance and repairs, plant-performance assessment, and technical reports with recommended actions. The service agreement defines the equipment covered, visit schedule, inspection scope and conditions for corrective interventions.

Can Plant Care cover equipment supplied by another manufacturer?

Yes, subject to an initial technical assessment. Wolmec reviews the installation, equipment condition and available documentation before defining the service scope. Coverage is agreed for the specific plant.

Does an annual plan mean one maintenance visit per year?

The annual or six-month term describes the duration of the service agreement. The number, timing and scope of visits are defined separately around the equipment and the site's operating needs.

Are emergency response times and spare parts included automatically?

Response conditions and any required parts, repairs or additional work must be defined in the service scope. Discuss the level of support you need during the assessment so the proposal states the applicable conditions.

What is the difference between preventive and corrective maintenance?

Preventive maintenance is planned around equipment condition and expected maintenance needs. Corrective maintenance addresses a fault or an identified operating problem. Both can be considered within a Plant Care programme, with their scope and conditions agreed in advance.

What happens if the assessment identifies a need for revamping?

The findings can become the starting point for a separate revamping or expansion proposal. This defines the modifications to equipment, material routes or automation needed to meet the new production objective.

Start with your process

A useful first conversation starts here

Tell us what needs to change. A complete engineering specification can come later.

Build your project brief

Useful information to share

  • Plant location and original manufacturer
  • Equipment list and available technical documentation
  • Recurring problems and maintenance history
  • Operating schedule and preferred intervention periods
Prefer a direct email?