Start with the equipment that can be retained
The project began with a survey of the existing line, machine by machine. A 3D model then supported the layout for the new two-level building, coordinating dimensions, working heights, access and equipment connections. Retaining machinery makes its condition and compatibility part of the design: the new arrangement must connect usable equipment with the changes required by the future process.
- Survey of the original production equipment
- 3D layout planning for the new two-level site
- Integration of existing machinery with new solutions