An existing dry-mix plant adapted to a new factory. Equipment surveys and 3D layout planning connect retained machinery with aggregate grading, ingredient dosing, batch mixing and recipe management linked to the customer's laboratory.

Complete dry-premix plant with mixing tower and silos
Silo storage
16 × 100 m³
Sand fractions
4
Micro-dosing
4 stations
Reported output
≈150 t / 8 hours

The customer requirement

A production line to move and modernise

Relocate an ageing premixed-powder production line and update its process for a new site. Existing equipment needed to work with new solutions in a building arranged over two levels.

The move created an opportunity to review the whole production route. Wolmec surveyed the original equipment and developed a 3D model to plan its integration into the new factory. The updated installation connects sand preparation, storage, ingredient dosing and batch mixing with custom controls. Retained sand mills form part of the revised process, while the customer's laboratory can update recipes and production plans through the software connection.

Wolmec project scope

  • Existing equipment survey and 3D planning for a two-level site
  • Integration of retained sand mills with updated transport and grading
  • Bulk storage, big-bag feeding, micro-dosing and manual additions
  • Batch mixing and custom production controls
  • Laboratory connection for recipes and production plans
  • Installation, no-load tests, functional commissioning and operator training

Inside the engineering

Retain useful equipment, redesign the complete route

01

Start with the equipment that can be retained

The project began with a survey of the existing line, machine by machine. A 3D model then supported the layout for the new two-level building, coordinating dimensions, working heights, access and equipment connections. Retaining machinery makes its condition and compatibility part of the design: the new arrangement must connect usable equipment with the changes required by the future process.

  • Survey of the original production equipment
  • 3D layout planning for the new two-level site
  • Integration of existing machinery with new solutions
Original equipment before relocation and integration
02

Prepare the sand fractions required by the recipes

The existing sand mills were incorporated into the updated preparation line. Belt conveyors feed a screening unit that separates four particle-size fractions for the customer's formulations. Grading therefore sits upstream of dosing: the required aggregate fractions must be available as distinct recipe ingredients before the powders reach the mixer.

  • Retained sand-grinding equipment
  • Updated belt conveying to the screening stage
  • Four particle-size fractions for recipe preparation
Sand screening and transfer equipment
03

Bring bulk materials and small additions into the same batch

The renewed plant includes sixteen 100 m³ silos, two big-bag unloading stations, four micro-dosing stations and a manual loading point. These routes serve ingredients with different supply formats and dose requirements. Storage, replenishment and dosing were integrated with the mixing sequence, so the main mineral ingredients and lower-volume additives can enter the formulation through appropriate feeding equipment.

  • 16 storage silos, each with 100 m³ capacity
  • 2 big-bag unloading stations
  • 4 micro-dosing stations and one manual loading point
Multiple screw conveyors beneath the powder silos
04

Integrate batch mixing with the surrounding process

A horizontal single-shaft mixer with plough-shaped tools prepares the powder batches. Its role was considered together with ingredient availability, loading, dosing and product discharge. In a plant upgrade, the engineering must assess the operations before and after mixing as well as the mixer itself: equipment connections and material preparation shape how the complete cycle works.

Horizontal mixer and maintenance access
05

Connect laboratory recipes with daily production

The custom software links the production system with the customer's laboratory, allowing recipes and production plans to be updated. A touch interface includes a graphical 3D representation of the installation to help operators follow the process. The design model supports layout engineering; the operator graphic makes the installed line visible during production. Both serve concrete, different purposes within the project.

  • Laboratory connection for recipe and production-plan updates
  • Custom controls for the renewed production line
  • Touch interface with a graphical 3D plant view
Wolmec operator interface showing the plant layout

The material route

From graded aggregates to the prepared batch

  1. 01Sand preparation
  2. 02Four-fraction grading
  3. 03Ingredient storage
  4. 04Recipe dosing
  5. 05Batch mixing
  6. 06Product discharge

From installation to an operating production line

Integration and installation were followed by no-load tests, functional commissioning and operator training. These stages brought the revised equipment routes and controls into operation together, with recipes and production plans connected to the customer's laboratory.

Existing assets and new solutions working at the new site

The relocation brought retained equipment, updated aggregate handling, storage, dosing and mixing into one coordinated production system. The published project reference reports approximately 150 tonnes in eight hours for this installation. That figure describes the documented configuration; production targets for another line must be assessed against its products, recipes and operating conditions.

  • Reuse the existing sand mills within a line replanned for the new two-level factory.
  • Prepare four particle-size fractions as separate ingredients for the dry-mix recipes.
  • Update production recipes and plans through the software connection to the customer's laboratory.
The plant in motionWatch the project filmView the installation on Wolmec’s YouTube channel

From this plant to your application

A process developed around your product

This project is a reference for producers planning a dry-mix plant upgrade, relocation or a broader product range. Aggregate fractions, ingredient quantities and mixing requirements guide the solution for each formulation.

Repair mortars and levelling compounds

Assess the mineral fractions, functional ingredients and recipe changes needed for technical dry-mix products. Special materials require suitable feeding and mixing arrangements.

Technical mineral blends

Develop storage, grading, dosing and mixing around the actual materials. Abrasiveness, tooling compatibility, cleaning and dose tolerances need technical assessment.

These are directions for a new configuration. The plant described is a dry-premix installation; equipment suitability and performance are evaluated for each customer's product.

Practical questions

Planning a dry-mix plant upgrade or move

Start with the existing equipment, the future process and the conditions at the site.

Can existing machinery be retained during revamping?

This project incorporated existing equipment, including the sand mills. Reuse depends on each machine's condition, compatibility with the future process and the objectives of the renewed line.

Can relocation and plant modernisation be developed together?

Yes. Here, the equipment survey and 3D planning supported a new layout over two levels. For another move, the site, connections, available shutdown window and commissioning activities need to be assessed, with responsibilities for dismantling and transport defined in the project scope.

Why does aggregate grading form part of the batching process?

Recipes may require different mineral fractions. This installation prepares four sand fractions upstream, making the required aggregates available for ingredient dosing and batch mixing.

How is the customer's laboratory connected to production?

The project's custom software allows the laboratory to update recipes and production plans. The connection and responsibilities for a new installation are defined around the customer's working methods and control requirements.

Bring your production plans

Plan the next chapter of your dry-mix plant

A move, a wider recipe range or a limitation in an existing line calls for an assessment of the complete process. We can review which assets can be retained and how material preparation, dosing, mixing and controls should connect in the future arrangement. The same assessment can support a complete relocation or a targeted upgrade where technically feasible.

  • Current products, raw materials and active recipes
  • Equipment inventory, condition and available drawings
  • Required aggregate fractions and additive dose ranges
  • Actual production, target output and recurring bottlenecks
  • Site layout, heights, access and available shutdown window
  • Laboratory workflow and recipe-update requirements

Share the current layout, machine list and the change you need to achieve. We can define the survey and technical assessment required to plan the intervention.

Discuss your plant revamping

Retrofit or a new plant: how should the options be compared?

You can include a layout, tender or technical brief with your enquiry

From site to installation

See the transformation

Before

New building before relocation of the dry-premix plant

After

Completed dry-premix production plant in the new building

In the field

More plants to explore

All projects

Revamping · Minerals

Calcium carbonate storage, dosing and transfer

A calcium carbonate handling system developed around rising raw-material demand, limited space and the structures of an existing production plant. Storage, dosing, transfer and Wolmec control software connect the expansion to the operating process.